Our Costa De Campo Peru project , progress page. 17 years later, we break ground. (on our owned beach property B06) Progress so far is plans all ready, and approved by Muni., and HOA and ready to build. We are at stage 1, see stage 1 photos at the end of this page. (just an example now) We are building only level #1 (floor) until we hit the lotto. (so far) at 2034 Square-feet level 1. See the Artist Conception photo below, click them to zoom! This is very close to what we want. at our Casa Playa. We don't need swimming pool as there is one here very close South Click photo below for slide viewer. ![]() See pre-plans . (link) Simple view not our real full real plans, those are private. Soil tests done, soils engineers done, needed for foundation design. ( B06 is ours , ocean front actual) this older photo lacks new paved road. ![]() To the South of our lot a super close by a nice huge pool. (for property owners) called the club and snack bar. ![]() Below: Our first Pour July 2024 Our lot B6 ![]() For more foundation work examples (others) see here. A blast from the past, a day 1 , aerial view photos of our property from the huge water tank pump up high. (2007 year) The CAMP is surrounded by security brambles and then huge adjacent agriculture fields (corn, etc) north and east and huge Mala river south side that feeds our lake. Status: (All plans, permits done, ready to build now.) March 2024 Soils engineering and HOA sign off of , home, septic , plumbing, water, electric, just got full Gen Contractor quotes. 3-6-2024, work begins now. (updates soon) July 2024, pouring crete. Just for fun I post our MALA river to the south boundry. Looking east. (fed from andes mountains) ![]() Landing in Peru ![]() Sunset @ Pulpos beach (octopus) Peru, ![]() One more Sun view trick by me. (fog) At Sister Ruth's Beach house. ![]() version 2. 6-26-2021, edits 3-7-2024 |