Page2: 

Red-bellied Woodpecker    (June 20th) our backyard feeder. 

                          
  Page 2:

Photo page,  vacations and new beach house.

  

VIDEO's
Costa-de-campo pool Costa lake

Beach house build videos phase 1 and 2, 

 Use Browser back arrow to exit video player .  Video's now Joined to only 3 MP4 files. (longer running)
Phase1 early 2024

Phase 2, November 2024, sealer, primter and final painting over plaster inside and out.


Final coat of real paint.  (end 2024)
My punch list:
  • Spring 2025,     Phase 1: Done (  finished   1st floor )
  • Bought all new floor tile and cove base materials.(etc)  1st floor now tile is done floors and bath walls too. and stairs tiled  and plumbing, drains, sinks, and Commode's Done !
  • Phase 2 is all new glass and doors.  Done  then Wood doors are of Cedar. Varnished.  All Done Some plastering done to meet cove  base,etc.
  • BioSeptic needs plumbed in. Done ,
  • Phase 3, Electrics. (99% done) 1st floor  lighting done , and outlets 250vac, and load centers first with new AC KW meter concrete base<  almost done, see slide show.

  • Next up,  front porch wide and steps leading up to it , concrete, all trash removed and new clean dirt and compacted. New JOB starting now. (this ends all 2025 work)
  • Side jobs to do, is kitchen counters and sink plumbing. (and Island with LPG Range)
  • 2nd floor is last and not scheduled. (for late 2026? years or future) (but tiled first)

(Future choices,  therma water heater,100liters ready to install,  add one  clothes washing machine)


First floor Tile Job May 2025



<<click me, and
see Slide show of 1st floor tile installation.



This is Video walk through ,  31 May 2025,  all finished tile 1st floor.


Windows and doors, slide show, June 2025 - in progress now. Lots  of glass and .cedar doors.   See Window test video  
All Done now

Misc. work,  the Biodigester system  (Done now) mid completion Video     and the Rotoplast  and my slide show of project poo. Done

Electric work.
 
spare
 
Conception 1:  (200m2  or 2153 sq. ft.)



Real progress: The front side East below are in progress. All new concete patio below. Trash to be removed . All new Soil and machine compacted. Plus stepping pads to the main road. (loop)  This older photo below is sans GLASS and no electrics. (both done now)


East side view: Just need some more clean dirt. (after trash pickup) out side lamps are next.



Updated 10-9-2025
Dec 1, 2024 Main Entrance, (work in progress heavy)  So far all tile done, plumbing ,  electics  , glass and door on 1st floor. (to end of 2025 a years work.)  No work allowed in Peruvian summer. (for the joy of Vacationer) All work ends November end.