Page2:
Page 2:
Photo page,
vacations and new beach house. (after 15 years we owned this beach property) we launch this ship:
VIDEO's ( first FYI )
Beach house build videos phase 1 and 2,
Use
Browser back arrow to exit video player use . This first sections
of Vidoes are building the full 2 floor shell, of massive concrete pour.
Phase1 early 2024
Phase 2, November 2024, sealer, primter and final painting over plaster inside and out.
Final coat of real paint. video (end 2024) 
2025:
My punch list:
-
Spring 2025, Phase 1: Done ( finished 1st floor )
-
Bought all new floor tile and cove base materials.(etc) 1st floor
now tile is done floors and bath walls too. and stairs tiled and plumbing, drains, sinks, and
Commode's Done !
-
Phase 2 is all new glass and doors. Done
then Wood doors are of Cedar. Varnished. All Done , Some plastering was done to meet cove base,etc.
- BioSeptic needs plumbed in. Done , (and commodes too)
- 2nd floor doors are now blocked with temporary plywood to stop birds from sneaking to 1st floor. done.
-
Phase 3, Electrics. ( done) 1st floor lighting done , and outlets 250vac, and load centers first with new AC KW meter concrete base< .

- Next up, front porch wide and steps leading up to
it , concrete, all trash removed and new clean dirt and compacted. Now done Dec 2025)

- New 1st floor 6 interior doors, and bunk beds and new glass showers bath rooms Jan-2026 (WIP)

Bath room 1 and 2 with new shower doors and lighted mirrors.
- Pending Side jobs to do, is kitchen counters and island and sink plumbing. ( LPG Range (island), oven counter, and Refrigerator, LG or SamSung)
- 2nd floor is last and not scheduled.
(for late 2026? years or future) (but tiled first is first. ,then
windows, and electrics last.)
This is the details section, big time construction works:
First floor Tile Job May 2025
<<click me, and see Slide show of 1st floor tile installation completed. done.
This is Video walk through , 31 May 2025, all finished tile 1st floor. Done
Windows 1st floor
and doors exterior , June 2025 - Done. Lots of glass
and 1 cedar front doors See Window lock test video 
Sanitary done, the Biodigester anaerobic system 600 liters 160 gallons, actual completion Video and the "Rotoplas" see slides of project poo. 
New Beach Video after clean up. 
2026 year:
New 2026 Quadracopter aerial view of Costa De Campo. 
Status 2026 March, onward, is 2nd foor is being
wired up now with GFIC AC power and all new pumbing ( See wiring job progress 2nd floor 
April
1st 2026 Walk Through day and night views 1st floor.
Lots of work in progress. (Please stand by do not touch that channel knob, sorry no commercials to see.)
We are now seen easy red arrow from the club house.
 
spare
Conception 1: 376 m2
total all floors: By architect: Ricardo Demarini Moreno
C.A.P 3035 + Engineer:Civil: Jorge F. Barrento Galvez C.I.P #27104

Real
progress: 99% done 1st floor. (just kitchen sink missing)
All new Soil and machine compacted. Plus
8 stepping pads to the main road. (loop) ,Interior doors done, (all doors done) 1st floor.

East
side view above: Lots of clean dirt added, 5 or more truck loads,
tons. Our lot limit is 60-ft. wide (20 meters?) but is 30ft wide home Note: fire proof.
December 20, 2025 beach side view below, 2nd floor work late next year ? 2026

Lots of debris to pickup still !
One more view of entrance below , the square pads seen afar is the 5000
gallon , fresh water concrete water tanks and water pump pit. Some day we want grass or ground cover plants.

Updated 4-3-2026
|
|
|
|
|